Installation









Durkeesox integrate and streamline its production procedures in the factory,leaving the installation work that on-site worker can easily manage well.That contributes to easier installation,lower cost and shorter construction time compared with that of traditional air duct.

Installation Type >>>

The installation of Durkeesox system is much easier than any conventional air duct system, which consists of 2 styles:

1.Cable suspension system.

2.Aluminum track suspension system

Cable Suspension System >>>

Cable Suspension System
Cable suspension system is more popular due to convenient installation and low cost. Which can be classified as following: By material: galvanized cable and stainless cable. By weight bearing capacity: ordinary cable and heavy duty cable. By rows of cables: single row, double rows and multiple rows. By suspension location: 12:00(single row), 2:00 &10:00 or 3:00 & 9:00 (double rows).
Ellipse duct

Ellipse duct use multi-row suspension method with DurkeeSox exclusively-owned patented pulling cable technology, effectively reducing the height of duct itself while ensuring visual pleasing.

 Returnsox®

Returnsox®use quadruple cable suspension system and Durkeesox exclusive & patented NIR supporting technology to maintain the flexible air duct in rectangle shape and return air under negative pressure.

Internal retention ring system

The installation of internal retention ring system utilizes cable suspension system with single row or double row suspension like normal series. Additional tension cables at the end of each straight section ensure fabric between rings is kept round and taut even when deflated.

Aluminum Track Suspension System >>>

The materials required to install DurkeeSox system includes: fabric air ducts, special fittings, components and accessories, which are supplied by the manufacturer (shipped with the consignment, including installation manual and assembly drawing, etc.). Other installation accessories required on site such as brackets, fastening bolts and others shall be purchased by the contractor.

Installation Procedures >>>

Measure and locate the height of bracket

Measure and locate the height of bracket

Locate the spacing of bracket

Locate the spacing of bracket

Install the bracket

Install the bracket

Cable measurement & cutting and fix the cable onto the bracket

Cable measurement & cutting and fix the cable onto the bracket

Tighten the cable from both sides

Tighten the cable from both sides

Fix the supporting cables

Fix the supporting cables

Inlet connection and fastening

Inlet connection and fastening

Connect the inlet with the first duct segment

Connect the inlet with the first duct segment

Connect duct segments

Connect duct segments

Straighten and adjust the duct

Straighten and adjust the duct

Ventilation for adjustment

Ventilation for adjustment

Fix the cable end clamp

Fix the cable end clamp